色戒完整版免费在线看|我的小姨在线观看完整版免费韩剧电影|色戒未删除完整版在线观看|欧美黄色一区二区,√天堂中文官网8在线,六月丁香婷婷在线,打狗棍电影在线观看完整版

 
Location:Home >>News >>Questions

Post welding inspection of box columns in steel structure processing

Update time:2020/08/07 18:06:08  Click:  
Post welding inspection of box columns in steel structure processing.
1. Appearance and dimensional inspection.
2 Ultrasonic testing
2.1 Design requirements: Full penetration welds should undergo ultrasonic testing in accordance with GB11345 standard.
2.2 The level of welds shall be in accordance with the design specifications.
2.3 The first level weld seam should be 100% inspected, and the qualification standards are: B-level standard, and II-level qualified; The inspection ratio for second level welds is 20%, and the qualification standards are B level standard and III level qualified.
------分隔線----------------------------